| Tackling the bathroom
|
|---|
| The bath is in place and plumbed in. |
|
| Shower and curtain done. |
|
| Vanity Unit, sink and mirror. |
|
| Built in Thetford toilet (the portapotti can at last be relegated to the emergency locker) |
|
| And the bedroom
|
|---|
| In order to maximise space, the bed is being built high (3ft to the top of the mattress). The basic frame is complete between the bulkheads awaiting plywood top. |
|
| After finishing with 9mm ply, the mattress is in place, and the tools are transferred into their new home out of the way |
|