Continuing the fit-out

   

Tackling the bathroom
The bath is in place and plumbed in.
Shower and curtain done.
Vanity Unit, sink and mirror.
Built in Thetford toilet (the portapotti can at last be relegated to the emergency locker)
And the bedroom
In order to maximise space, the bed is being built high (3ft to the top of the mattress). The basic frame is complete between the bulkheads awaiting plywood top.
After finishing with 9mm ply, the mattress is in place, and the tools are transferred into their new home out of the way

Return to "Mr Jinks" Home page


Copyright © 2004 Dave Mayall